NEWS

From Precast to MiC: 155 Years of Innovation with P&T Group

16
Dec 2024

For over 155 years, P&T Group has been at the forefront of architectural and engineering innovation, transforming the way buildings are designed and constructed. From early precast construction in Singapore to pioneering Modular Integrated Construction (MiC) in Hong Kong, our journey reflects a legacy of continual improvement and sustainable practices.

Key Milestones:

  • 1990s: Early adoption of precast technology in Singapore public housing, revolutionizing construction efficiency with innovative precast elements in beams, slabs, and walls.
  • 2000s: Introducing breakthroughs like precast load-bearing columns and shear walls, enhancing speed, precision, and labor reduction in projects like Park Green Executive Condominium.
  • 2010s: Delivering landmark projects such as The Crest and The West Terra, the first concrete PPVC (Precast Prefinished Volumetric Construction) project in Singapore, setting new benchmarks in modular construction.
  • Hong Kong Expansion: Adapting MiC systems to Hong Kong’s high-rise challenges, including patent-pending composite wall designs for enhanced efficiency and space optimization.

Today, our innovations like six-sided factory-finished modules with integrated MEP services (e.g., Tampines Tapestry) and advanced MiC designs (e.g., Jat Min Chuen Elderly Housing) are shaping the future of sustainable, labor-efficient construction.

P&T Group remains committed to pushing boundaries, leveraging decades of expertise to drive innovation and contribute to the evolution of the global construction industry.

For the full details please refer to the P&T E-magazine:

https://web.p-t-group.com/en/news-detail.php?news_id=189

BACK TO LIST