Description
Schematic design for Addition & Alteration Work of Airport Authority Building (AAB) at Hong Kong International Airport, transforming the existing AAB to a new HKIA lounge, schematic spatial arrangement, schematic flow/ circulation planning of the facilities, technical assessment on MEP provision, statutory design perimeters, proposed development programme and project cost estimation.
CLIENT
Hong Kong Airport Authority
START / COMPLETION
2021/2022
GFA
6000 sqm
LOCATION
Hong Kong SAR